400 Cincinnati-41 oz. Barrel
Mold/machine set-up $325.00
Mold/shop time $175.00/hr.
Runs exceeding 25 hrs. $100.00/hr.
165 Ton Cincinnati- 13 oz. Barrel
Mold/machine set-up $275.00
Mold/shop time $175.00/hr.
Runs exceeding 25 hrs. $100.00/hr.
120 Cincinnati-10 oz. Barrel
Mold/machine set-up $275.00
Mold/shop time $175.00/hr.
Runs exceeding 25 hrs. $100.00/hr.
150 Ton Shine-7.6 oz. Barrel
Mold/machine set-up $275.00
Mold/shop time $175.00/hr.
Runs exceeding 25 hrs. $100.00/hr.
110 Ton Cincinnati- 12 oz. Barrel
Mold/machine set-up $275.00
Mold/shop time $175.00/hr.
Runs exceeding 25 hrs. $100.00/hr.
80 Ton Newbury- 2.3 oz. Barrel
Mold/machine set-up $275.00
Mold/shop time $175.00/hr.
Runs exceeding 25 hrs. $100.00/hr.
100 Ton Wabash Compression Molding
Mold/machine set-upN/C
Molding/shop time $175.00/hr.
12”x12”x 0.125” - 0.500”
1.5” 5hp Single Screw Sterling Extruder
Extruding time $100.00/hr.
Painting, Consulting, Mold Fabrication
Pricing per individual requirements
Moisture Proof Sealed Sample Bags
12”x12”x 0.005” bag $5.00/bag
Additional Information
Immediate response time. All services can be initiated within 72 hours of receiving material. Normal laboratory hours are 8am-12 midnight. Extended runs can be conducted around the clock to expedite large orders.
10,000 ft off-site warehousing facilities
Secrecy agreements and non-disclosure agreements available upon request
Supplier, at his/her option, is welcome to be on-site and to participate in all services offered
Sample Calculations
2 cavity mold# 1A-1 5”x 5”x0.100”
Cycle time for optimum test panels- 55 sec
Utilize 165-ton Cincinnati
5 pcs/lb= 100lbs material required
$275.00 Mold/machine set-up includes:
-Material handling/mixing
-Material drying
-Moisture analysis (prior to molding)
-Mold set-up
-Machine purging
4 hr. minimum at $175.00/hr.
Appprox. 2pcs/min x 60 min x 4= 480 pcs.
Total cost= $ (plus shipping)
Note: There is a 4 hour minimum Mold/shop time for each job and the total cost to mold 1 plaque to 400 plaques would be the same (in a 2 cavity mold)
MSDS to be in-house for all materials prior to project start-up
*Prices subject to change at anytime*